Zimba Mission Hospital Replacement Batteries for Solar Electrical System – Zambia

WM06-1551 | Medical

The solar power electrical project will be completed in 2018. The back-up batteries will last for five years. It is anticipated that new back-up batteries will need to be replaced by 2023. This fund will ensure that money will be available to replace the batteries when necessary.